celine@ecozy.be  T. 0474.303.490

Rue des Francs, 1040 Bruxelles

  • Pinterest - Grey Circle
  • Facebook Basic Black
  • LinkedIn Basic Black
  • Houzz Social Icon
BBPO-FBPO - LOGO.jpg

Les photos de ce site web et de ce blog ne sont pas libres de droit. Contactez moi si vous souhaitez plus d'informations sur leur reproduction.

© 2020 by Céline De Schryver. Tous droits réservés.

HOW DOES THE VIIST TAKE PLACE?

Here are some information in order for you to prepare my visit and allow me to make the most representative certificate in the best time possible :

 

Before the visit

You need to prepare the following documents :

  • If some parts of the building are insulated (walls, roof, windows) and this cannot be seen, I will need some proof (the contractor’s invoice, the energy bonus of the Region, etc.).

  • The plans of the building, if you have them.

 

During the visit

The visit lasts on average 1 hour for an apartment and 2 to 3 hours for a house. I will have to visit the entire apartment. Measures of all surfaces and windows will be taken. I need to investigate the heating system, if it is a communal system I will need access to the technical room.

 

After the visit

The certificate will be made within 2 business days after the visit (as long as all required documents have been provided).